![](https://fbcdn-sphotos-d-a.akamaihd.net/hphotos-ak-prn2/1461165_613807902001068_454776340_n.jpg)
• Procurement to be undertaken by DOE through PS DBM
• Presented to PBSAIII together with the VVIP Fixed-Wing Aircraft on 20 May 2013: 2 S-70i approved
• 05 Sep 13: PS DBM BAC preliminary meeting: Project discussion
• For presentation of Nego Proc mode
Projected Delivery
2015 (1)
21 months after LC opening
http://goo.gl/lJQI7M